Fairbanks FDOT
Project
HSW was selected for this unique, performance-based, remediation
project for the FDOT. HSW has taken over all environmental tasks
at this site; including strategic planning and financial negotiations,
assessment, remediation, and current system O&M. The performance-based
contract establishes a fixed fund for reaching target cleanup levels
in multiple aquifers, with shared savings between HSW and FDOT when
the work is successfully completed for less than is funded.
The existing groundwater remediation system, designed and installed
by others, consists of horizontal recovery trenches for capturing
surficial aquifer groundwater and vertical recovery wells for capturing
Intermediate Aquifer groundwater. The recovered groundwater is routed
to one of five treatment buildings with air stripping towers. The
treated water is routed to one of three onsite percolation ponds.
An irrigation system is used to manage water levels in one of the
percolation ponds to eliminate the need for an NPDES permit.
HSW intends to accelerate cleanup while cutting costs by optimizing
the existing treatment systems and by evaluating more effective,
innovative technologies. To date, HSW has reduced significantly
the labor required for the system O&M as well as reducing the
number of recovery/treatment systems operating.
|