
Back to Environmental Page
Other Environmental Projects:
• Fairbanks FDOT
Project
• STOLLER – DOE STAR Center
• NASA – Kennedy Space Center
• Northrop Grumman – Georgia
• Tampa Electric Company
• LM Missiles
• City of Ocala
• Florida-based Engineering Co.
Related Links:
• Water Resources
• Civil / Land
Development |

Comprehensive Environmental Study
at a Coal-fired Power Plant
HSW assessed and evaluated the environmental conditions at a Tampa facility for the purpose of determining regulatory
compliance, evaluating potential noncompliance, and developing a plan, including recommended remedial activities, that
will allow the facility to attain and maintain compliance with environmental permits and regulations. The primary focus
of facility compliance is stormwater management.
The study encompasses a variety of surface water issues including identifying potential pollutant sources, managing contact
and non-contact stormwater, and developing strategies for prevention of uncontrolled releases. HSW’s project team developed
a comprehensive stormwater runoff model to assess rainfall-runoff scenarios as established in existing permits or other
regulatory guidelines. Model results are used to evaluate the capacity of existing stormwater structures and for conceptual
design of potential improvement projects. Eighteen improvement projects were identified and prioritized.
|