Home Home
Home Site Map Contact Us
Firm OverviewServicesClientsNewsCareer Opporunities





Back to Environmental Page

Other Environmental Projects:
    • Fairbanks FDOT Project
    • STOLLER – DOE STAR Center
    • NASA – Kennedy Space Center
    • Northrop Grumman – Georgia
    • Tampa Electric Company
    • LM Missiles
    • City of Ocala
    • Florida-based Engineering Co.

Related Links:
    • Water Resources
    • Civil / Land Development

Comprehensive Environmental Study
at a Coal-fired Power Plant

HSW assessed and evaluated the environmental conditions at a Tampa facility for the purpose of determining regulatory compliance, evaluating potential noncompliance, and developing a plan, including recommended remedial activities, that will allow the facility to attain and maintain compliance with environmental permits and regulations. The primary focus of facility compliance is stormwater management.


The study encompasses a variety of surface water issues including identifying potential pollutant sources, managing contact and non-contact stormwater, and developing strategies for prevention of uncontrolled releases. HSW’s project team developed a comprehensive stormwater runoff model to assess rainfall-runoff scenarios as established in existing permits or other regulatory guidelines. Model results are used to evaluate the capacity of existing stormwater structures and for conceptual design of potential improvement projects. Eighteen improvement projects were identified and prioritized.


HSW Engineering, Inc. ° 3820 Northdale Blvd., Suite 210B ° Tampa, FL 33624
(813) 968-7722

Copyright 2005 HSW Engineering. All rights reserved.

Environmental Water Resources Civil / Land Development